A.inform the chief engineer whenever there are problems
B.reduce the time wasted on checking items
C.know who is responsible for the domestic cleaning equipment
D.know the chain of authority on the ship
您可能感興趣的試卷
你可能感興趣的試題
A.send a requisition list to the supplier
B.check that whether the items ordered have been already delivered
C.make the chief engineer on sport
D.follow a preset procedure
A.make clear of your authority
B.make friends with ships crew
C.call the first engineer if there is a problem
D.call the master if there is a problem
A.Chief engineer
B.Second engineer
C.Master
A.All scuppers plugged by carpenter
B.Tanks sounded from time to time
C.Watch kept for leakage
D.Take oil samples
A.When to bunker?
B.Type of FO
C.Pollution prevention measures
D.Engineer to be responsible for

最新試題
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The main purpose of port State control is not to()
The condensers located in various stages of a flash evaporator are cooled by()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
() is not installed on the main switchboar.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish