單項選擇題Who will mainly handle the negotiation during store and spare parts transaction?()
A.Chief engineer
B.Second engineer
C.Master
您可能感興趣的試卷
你可能感興趣的試題
1.單項選擇題Which of the followings needs not to be considered during bunkering?()
A.All scuppers plugged by carpenter
B.Tanks sounded from time to time
C.Watch kept for leakage
D.Take oil samples
2.單項選擇題Which of the followings needs not to be considered for bunkering?()
A.When to bunker?
B.Type of FO
C.Pollution prevention measures
D.Engineer to be responsible for

最新試題
() is not installed on the main switchboar.
題型:單項選擇題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
題型:單項選擇題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
題型:單項選擇題
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
題型:單項選擇題
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
題型:單項選擇題