A.the total weight in air of the casing string is removed from the ship
B.the hook load (weight of the casing string) is removed from the ship
C.the weight of the casing inside the riser is removed from the ship
D.the weight of the casing string added to the weight of the fill-up mud is removed from the ship
您可能感興趣的試卷
你可能感興趣的試題
A.equal to the chains they are connecting
B.25% more than the chains they are connecting
C.50% more than the chains they are connecting
D.100% more than the chains they are connecting
A.half the breaking strength of the mooring line
B.the full breaking strength of the mooring line
C.the maximum expected tension of the mooring line
D.50% over the working tension of the mooring line

最新試題
Limit switches on gravity davits should be tested by().
The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward. This is the signal to().
A whipping on a fiber line().
The rope which is rove from the truck to be used with a bos’n chair is called a().
An anchor winch should be equipped with mechanical brakes capable of holding().