A.the engineers,from a panel in the engine room
B.shutting off the current to the winch
C.pushing the switch lever arm while the winch is running
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.increasing the shaft RPM prior to release
B.using a pelican hook for quick release
C.using preventers
D.using a short chain for the lead through the stern chock
A.5 times the depth of the water in good holding ground
B.10 times the depth of the water in shallow water
C.2 times the depth of the water in poor holding ground
D.8 times the depth of the water in deep water

最新試題
In moderate wind and current what should be the length of chain with a single anchor?()
In securing a towing cable,consideration must be given to letting go in an emergency. The possible whip of towlines when released can be overcome by().
The rolling hitch could be used to().
Manila lines in which the strands are right-hand laid().
Chafing gear is used to().