A.inspect
B.impairs
C.impacts
D.insects
您可能感興趣的試卷
你可能感興趣的試題
A.commence
B.generate
C.give
D.have
A.liable for any repair
B.liable for any failure
C.responsible for any repair
D.responsible for any fulfilling
A.to their final position with the winch operating at slow speed
B.to the bar stop,and then hand cranked to their final position
C.until just before they make contact with the limit switch,and then hand cranked to their final position
D.to the embarkation deck,and then hand cranked to their final position
A.coiled
B.faked
C.flemished
D.seized
A.Personnel may work beneath suspended loads,as long as they are alert and wear hard hats
B.If a suspended load with no tag begins to spin,personnel should attempt to stop the spinning if the load is within reach
C.If tag lines are used to control a suspended load,they should be secured to the deck
D.Personnel not involved in the hoisting operation should be kept clear of the transfer area
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
The process of lowering a boom to a horizontal position and onto its deck support is called().
You must ensure that lifesaving equipment is().
The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().
To warp a vessel means to().
Which mooring line prevents sideways motion of a vessel moored to a pier().
The terms ceiling and margin plate are associated with the().
What is TRUE about hoisting operations().
The tweendecker has()below the main deck.
You are handling a mooring line and are instructed to Check the line.What should you do().