A.unit method
B.block method
C.straight method
D.package method
您可能感興趣的試卷
你可能感興趣的試題
A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
A.In due course
B.On time
C.In time
D.Swiftly
A.loosely
B.closely
C.heavily
D.strongly
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
When general cargo with different amounts in each draft is involved,the checker must use the ().
Due to the shape of the(),whereby forward- and aft ship are differently shaped,a trim correction on the draft measurement has to be done.
The cargo is liable to burn.Please keep it()the engine room.
The majority of cargo gear breakdowns are a result of().
The foreman says that the stevedores stopped working owing to the()of the winch.
Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
The cargo fall over the dock is called the().
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
We’ll adopt the mechanical tallying method().
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().