A.Loading
B.Discharging
C.Crude oil washing
D.Steaming tanks
您可能感興趣的試卷
你可能感興趣的試題
A.A centerline crane can never be operated in tandem
B.One crane is able to work one end of two adjacent hatches
C.These cranes are more economical and weigh less than outboard-mounted cranes
D.One crane is able to work both sides of the ship
A.The cranes may be operated independently
B.The cranes may be interconnected for twin operation
C.When twinned,the crane rotation on the foundation assembly is unlimited
D.All of the above

最新試題
They()loading at 1400 hours.
Running an electric winch at slow speed over a long period of time causes().
When using slings,cargo handlers should take all the following precautions except().
The Master or person in charge of a ship shall ensure the crane record book shows the().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.