A.Should not exceed
B.Must be up to
C.Should exceed
D.Should be about
您可能感興趣的試卷
你可能感興趣的試題
A.get the bow up
B.discharge from the wings first
C.discharge from the centerline tanks first
D.discharge from amidships first
A.Cranes are able to pick up and drop loads over a greater spotting area
B.Increased safety because the deck is clear of running and standing rigging
C.Simplicity of operation of the crane by its operator
D.All of the above
A.It allows for rotation of the hook in the single mode
B.It is required to“twin-up”30-ton pedestal cranes
C.It is used to pick up light loads
D.It is used to rigidly connect two cranes
A.Stopping the boom
B.Topping or lowering the boom
C.Moving the boom left or right
D.All of the above
A.It prevents the load from swinging when the boom level is adjusted
B.Less power is needed when topping the boom with a load on the hook
C.It maintains the height of the load above the deck
D.All of the above
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
Official draft measurements should be()by authorized persons,agreed by both parties involved.
On no account()to be exceeded.
What is meant by the term“l(fā)uffing the boom”of a crane().
Most pedestal crane power is provided by().
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
When viewed from above,the best position for the guy in relation to the boom is().
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
The Master or person in charge of a ship shall ensure the crane record book shows the().
Which statement comparing a shipboard crane to conventional gear is TRUE().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().