A.load
B.loading
C.will load
D.to load
您可能感興趣的試卷
你可能感興趣的試題
A.riser stabilizers
B.guideline tensioning system
C.riser tensioning system
D.guideline stabilizers
A.discharge
B.recircle
C.load
D.take in
A.out
B.beyond
C.from
D.off
A.butterfly valve
B.spectacle valve
C.check valve
D.globe valve
A.before the gripes are removed
B.before loading the passengers
C.after loading the passengers
D.after the boat is afloat

最新試題
The net productivity per gang-hour can be improved through a decrease of().
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().
What does “evel-luffing” accomplish during crane operations().
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
The item()is not the advantage of the hydraulic winch.
Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
The Master or person in charge of a ship shall ensure the crane record book shows the().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
Which statement comparing a shipboard crane to conventional gear is TRUE().