單項選擇題The proper place()the sling is made up is the square of the hatch.
A.which
B.where
C.when
D.how
您可能感興趣的試卷
你可能感興趣的試題
1.單項選擇題The port clearance for a ship should be granted()the completion of loading or discharging in the port.
A.before
B.when
C.after
D.during
2.單項選擇題The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().
A.maximum counter weight required
B.minimum horsepower required
C.hoist rope strength
D.allowable load

最新試題
They()loading at 1400 hours.
題型:單項選擇題
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
題型:單項選擇題
Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().
題型:單項選擇題
The item()is not the advantage of the hydraulic winch.
題型:單項選擇題
Most pedestal crane power is provided by().
題型:單項選擇題