單項選擇題The port clearance for a ship should be granted()the completion of loading or discharging in the port.

A.before
B.when
C.after
D.during


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().

A.maximum counter weight required
B.minimum horsepower required
C.hoist rope strength
D.allowable load

2.單項選擇題The boom indicator tells the operator at what angle the boom is compared to the().

A.horizontal position of the boom
B.vertical position of the boom
C.horizontal position of the load being lifted
D.vertical position of the load being lifted