A.the ship security plan
B.the company security plan
C.the port security plan
D.the national security plan
您可能感興趣的試卷
你可能感興趣的試題
A.Inspector general
B.Captain of the port
C.local port authority
D.state pollution board
A.expansion space to leave in a tank
B.flash point at which the fuel will burn
C.temperature to which the fuel must be heated
D.rate at which the fuel can be pumped during transfer operations
A.second stage feed heater
B.saltwater feed heater
C.distillate cooler
D.second stage vapor separator
A.spray pipes
B.demisters
C.condensers
D.splash baffles
A.deaerate the first effect distillate
B.filter the condensed flash vapors
C.deaerate the first and second effect distillate
D.remove small water droplets entrained in the flashed vapor
最新試題
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The condensers located in various stages of a flash evaporator are cooled by()
The treatment of the fuel oils involves storage, heating, filtering and()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The ISPS Code consists of a mandatory section-Part A, which shows()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()