單項(xiàng)選擇題Small droplets of water entrained in the flashed vapor produced in a flash-type evaporator, are removed by the ()

A.spray pipes
B.demisters
C.condensers
D.splash baffles


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The demisters installed in a flash-type evaporator serve to ()

A.deaerate the first effect distillate
B.filter the condensed flash vapors
C.deaerate the first and second effect distillate
D.remove small water droplets entrained in the flashed vapor

2.單項(xiàng)選擇題A vacuum is initially established in the first and second stages of a low pressure evaporator by the use of ()

A.vacuum drag from the auxiliary condensate system
B.individual vacuum pumps
C.a single non-condensing air ejector
D.a two stage air ejector

3.單項(xiàng)選擇題The heated feed-water entering any flash chamber of a flash-type evaporator will()

A.vaporize, with the un-flashed water remaining at the temperature at which it entered the flash chamber
B.vaporize, with the un-flashed eater equalizing to the saturation conditions existing in the f lash chamber
C.vaporize, with the remaining water a t a temperature greater than it entered the flash chamber
D.boil, allowing steam bubbles to rise through the brine at the bottom of the flash chamber

4.單項(xiàng)選擇題On a multistage flash-type evaporator, the flash chamber is ()

A.combined as part of the salt water feed heater
B.the open area above the brine levels in the first and second stages
C.combined as part of the distillate cooler
D.another term used to describe the vapor feed heater

最新試題

The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.

題型:?jiǎn)雾?xiàng)選擇題

The ISPS Code consists of a mandatory section-Part A, which shows()

題型:?jiǎn)雾?xiàng)選擇題

A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()

題型:?jiǎn)雾?xiàng)選擇題

The treatment of the fuel oils involves storage, heating, filtering and()

題型:?jiǎn)雾?xiàng)選擇題

During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.

題型:?jiǎn)雾?xiàng)選擇題

() is not installed on the main switchboar.

題型:?jiǎn)雾?xiàng)選擇題

The shipboard oil pollution emergency plan will be invalid after ()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:?jiǎn)雾?xiàng)選擇題

As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()

題型:?jiǎn)雾?xiàng)選擇題