A.fuel delivery pressure
B.pump plunger diameter
C.plunger control rack position
D.total pump stroke
您可能感興趣的試卷
你可能感興趣的試題
A.land
B.skirt
C.crown
D.plate
A.excessive speed
B.improper warm-up
C.extreme misalignment
D.inadequate lubrication
A.Sludge
B.Gasoline
C.Fuel oil
D.Lube oil
A.camshaft
B.main spring
C.rack position
D.nozzle orifice size
A.not taper what so ever
B.the skirt being tapered and smaller than the crown
C.the skirt being tapered and larger than the crown
D.the crown being tapered and smaller than the skirt
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
To proceed to the assistance of a ship in distress is()
The treatment of the fuel oils involves storage, heating, filtering and()
The ISPS Code consists of a mandatory section-Part A, which shows()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The condensers located in various stages of a flash evaporator are cooled by()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Diesel engine air start system check valves are opened by ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()