A.excessive internal leakage in the pump
B.low discharge pressure and fluid flow
C.excessive fluid level in the hydraulic reservoir
D.operation of the pump at 100% efficiency
您可能感興趣的試卷
你可能感興趣的試題
A.need to repair
B.need to be repaired
C.needs to repair
D.needs repairing
A.to repair
B.to be repaired
C.repairing
D.being repaired

最新試題
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Which of the following items don’t belong to dock repair works?()
The shipboard oil pollution emergency plan will be invalid after ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish