A.close the static leg filling valve B.close the overflow tank falling valve C.reduce the fuel oil pumping rate D.stop the fuel oil pumping operation
A.The pressure-vacuum relief valve should be reset B.The tanks should be made seaworthy to prevent contamination C.The tanks should be sounded to make sure the levels are not rising D.The tanks should be marked with a bull stamp on the manifold filling valve
A.hose joints are made up B.tanks are being topped off C.system is being lined up D.pumping operation is first started