單項(xiàng)選擇題

Which of the following should be the FIRST step in removing a generator from parallel operation?()

A.Trip the generator off the switchboard
B.Turn off all electrical equipment
C.Remove the load from the "off going" generator
D.Increase the cycles of the generator staying on the line

微信掃碼免費(fèi)搜題