您可能感興趣的試卷

最新試題
翻譯:There are two approaches to the problem of determining the fluid saturation within a reservoir rock. The direct approach is to measure, in the laboratory, the saturation of selected rock samples recovered from the parent formation. The indirect approach is to determine the fluid saturation by measuring some related physical property of the rock.
翻譯:After the casing string is run, the next task is cementing the casing in place. An oil well cementing service company is usually called in for this job although, as when casing is run,the rig crew is available to lend assistance.
翻譯:It has been suggested that an effective oil source rock generates 10-40 bbl or oil per acre ft (0.0013-0.0052 cc/cc) for each one per cent of organic carbon. This is approximately 500-2000 ppm by weight.
翻譯:The fluids of a petroleum reservoir are generally gas, oil, and water in varying proportions. Each phase can differ widely in composition and properties. Gas and oil, either as separate fluids or in mixtures, change their state or phase as reservoir pressure changes.
翻譯:The first step in planning a well should be the gathering of all available data on past wells. In this respect it is important to be completely familiar with all sources of information, the availability of the sources, and the information normally associated with each source.