單項選擇題()will be paid by shipowner after tallyman doing the tally work.
A.cargo-handling expense
B.tally money
C.cargo-tally dues
D.tally fees
您可能感興趣的試卷
你可能感興趣的試題
1.單項選擇題An electronic chart system meeting IMO specifications for complying with chart carrying requirements is an().
A.E-Navigation
B.Integrated Bridge system
C.Electronic Chart System
D.Electronic Chart Display and Information System
2.單項選擇題The distance traveled by the center of gravity perpendicular to the original course is().
A.transfer
B.advance
C.kick
D.tactical diameter

最新試題
The company should establish and maintain procedures to control all documents and date which are relevant to().
題型:單項選擇題
According to the relevant regulation, lifeboat should be powered by().
題型:單項選擇題
Which of the following is not a form of precipitation?()
題型:單項選擇題
Before any loading takes place any signs of the previous cargo should do().
題型:單項選擇題
It is dangerous for vessels without the operational radar()the estuary.
題型:單項選擇題