單項(xiàng)選擇題Initial stability is indicated by().
A.GM
B.KM
C.deck load
D.maximum allowed KG
您可能感興趣的試卷
你可能感興趣的試題
1.單項(xiàng)選擇題It is sometimes necessary to moor bow and stern to two mooring buoys in order to().
A.avoid any swing in a restricted space
B.prevent to touch with other vessels
C.make a convenience of cargo discharging
2.單項(xiàng)選擇題It would be possible that part of the cargo got()as great change in the weather during the voyage caused heavy()in the hold.
A.damp/water
B.dampness/sweater
C.wet/condensation
D.wetness/dew

最新試題
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
題型:?jiǎn)雾?xiàng)選擇題
Berthing means bringing a vessel to her berth until().
題型:?jiǎn)雾?xiàng)選擇題
A tide is called diurnal when().
題型:?jiǎn)雾?xiàng)選擇題
Which of the following is not a form of precipitation?()
題型:?jiǎn)雾?xiàng)選擇題
Which of the following is not an operation mode of AIS?()
題型:?jiǎn)雾?xiàng)選擇題