單項(xiàng)選擇題The port clearance for a ship should be granted()the completion of loading or discharging in the port.
A.before
B.when
C.after
D.during
您可能感興趣的試卷
你可能感興趣的試題
1.單項(xiàng)選擇題The port gang way caught on a()on the wharf and was severely damaged.
A.bollard
B.bitt
C.stem
D.keel
2.單項(xiàng)選擇題The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
A.the port of destination
B.the next port of call
C.the port of arrival
D.the last port of call

最新試題
What is it called when it is possible to ignite the vapour above the oil?()
題型:單項(xiàng)選擇題
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
題型:單項(xiàng)選擇題
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
題型:單項(xiàng)選擇題
Which of the following is not a form of precipitation?()
題型:單項(xiàng)選擇題
Despite the rising importance and great convenience of the gyrocompass,the magnetic compass still retain its importance because of its().
題型:單項(xiàng)選擇題