A.Press up the slack NO.1 starboard double bottom tank
B.Pump out the forepeak tank
C.Eliminate the water in the 'tween decks aft
您可能感興趣的試卷
你可能感興趣的試題
A.Open the intake valve to an adjacent tank
B.Set out drip pans and sawdust and begin to mop up the spill
C.Signal the shore control point to shut down
D.Close the valve on the tank vent line
A.a decrease in reserve buoyancy
B.a decrease in the maximum draft
C.the vessel to flop to port or starboard
D.None of the above
A.chemical protection face shield
B.approved work vest
C.self-contained breathing apparatus
D.marlinspike
A.Phosphorous
B.Safety
C.Self-extinguishing
D.Wooden
A.The river level is above the Low Water Reference Plane
B.Red Store Landing Revetment is ahead on your starboard side
C.This gage reading is at a lower elevation than the same reading on the gage at Head of Passes
D.None of the above
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
You are ordering ship’s stores. Which statement is TRUE?()
A tackle by which the outer end of a boom is raised and lowered is the topping().
You are passing the Bayou Sara gage which reads 3.9 feet. Which of the following statements is TRUE?()
Your vessel is equipped with a fixed CO2 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?()
A splice that can be used in running rigging,where the line will pass through blocks,is a().
() is true.
A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().
“15 02 41 Semi Double Queen 195 332mm”is a description of().
Kort nozzles are installed around the propellers of some vessels to().
Which is a part of a vessel’s standing rigging().