A.provision order
B.discharging planning
C.annual repair
D.outward clearance
您可能感興趣的試卷
你可能感興趣的試題
A.better control capabilities
B.less maintenance and repair
C.fewer personnel needed during jacking
D.less preload needed
A.incurred
B.happened
C.spent
D.paying out
A.you must visually signal oncoming vessels
B.you must immediately tie up in the nearest port until the radiotelephone is repaired
C.you must anchor until the radiotelephone is repaired
D.the loss of the radiotelephone must be considered in navigating the vessel
A.immediately anchor your vessel and arrange for repairs to the system
B.moor your vessel at the nearest dock available and arrange for repairs to the system
C.arrange for the repair of the system to be completed within 48 hours
D.exercise due diligence to restore the system at the earliest practicable time
A.which
B.at which
C.there
D.at there
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
If your radiotelephone fails while underway,().
The Certificate of Inspection of a damaged tank barge has expired. What certificate authorizes the barge to move to a repair facility for repair and inspection?()
Repair of structures on a ship in the vicinity of liquid mud handling areas presents what possible hazard?()
I’ll have the damaged parts repaired in Hongkong and send you in due course the amount of expenses().
Rivets are usually made of().
No claim for constructive total loss based upon the cost of recovery and/or repair of the Vessel shall be recoverable hereunder unless such cost would exceed().
Please have the damage on gangway()as soon as possible for account of the Stevedore Company.
The equipment is very old.It’s not worth().
Repairing damage to the hull at or above the waterline reduces the threat of().
Starting motors,generators,and other spark producing devices should be mounted as high above the bilges as possible to().