單項(xiàng)選擇題All items such as steam pipes, exhaust pipes and fittings which, because of their location and operating temperature, present a hazard should be adequately lagged.That means the items should()

A.not be put into operation too early
B.be pay adequate attention to
C.be used only when necessary
D.be coated with certain material


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題In machinery space, the valves, pipes should be()

A.arranged as close to each other as possible to save space
B.arranged far away from each other for convenient operation
C.be fixed or clamped to avoid vibration
D.kept easy removable as to convenient repairing work

2.單項(xiàng)選擇題The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()

A.stays at rest
B.is working stably
C.is worn out
D.is in good operation

3.單項(xiàng)選擇題Before starting an engine by air, the engine must()

A.be turned by a turning gear for at least one minute
B.be turned by a turning gear for at least two minutes
C.be turned at least one complete turn
D.be turned at least two complete turns

4.單項(xiàng)選擇題The oil pressure and flow from each bearings can be checked when()

A.the lubricating pumps are stopped and the access doors are opened
B.the lubricating pumps are running and the access doors are opened
C.the engine is running and the access doors are closed
D.the engine is stopped and the access doors are closed

5.單項(xiàng)選擇題When preparing an engine for water temperature()

A.should be kept at a proper level by a cooler
B.should be raised to about 80℃ by a heater
C.should be raised gradually
D.should be lowered to about 60℃

最新試題

The main purpose of port State control is not to()

題型:?jiǎn)雾?xiàng)選擇題

The treatment of the fuel oils involves storage, heating, filtering and()

題型:?jiǎn)雾?xiàng)選擇題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:?jiǎn)雾?xiàng)選擇題

Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()

題型:?jiǎn)雾?xiàng)選擇題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()

題型:?jiǎn)雾?xiàng)選擇題

During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.

題型:?jiǎn)雾?xiàng)選擇題

If separating effect is not good, which measure should be taken ()

題型:?jiǎn)雾?xiàng)選擇題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:?jiǎn)雾?xiàng)選擇題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題