單項選擇題() is not one of the winch controls.
A.a master controller or switchbox
B.a group of relays
C.contactors
D.a solenoid brake
您可能感興趣的試卷
你可能感興趣的試題
1.單項選擇題When checking the oxygen content of the cargo tanks prior to loading cargoes requiring vapor recovery,the atmosphere must be sampled().
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
2.單項選擇題When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().
A.winch speed
B.boom strength
C.load radius
D.cable strength

最新試題
What is the purpose of the equalizing beam aboard a crane vessel().
題型:單項選擇題
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
題型:單項選擇題
Damage by()shall not be considered as handling damage.
題型:單項選擇題
They()loading at 1400 hours.
題型:單項選擇題
How should you signal the crane operator to move slowly().
題型:單項選擇題