A.discharge side of condenser
B.discharge side of compressor
C.outlet of the evaporator
D.receiver tank
您可能感興趣的試卷
你可能感興趣的試題
A.increase the amount of cooling water to the condenser
B.decrease the amount of cooling water to the condenser
C.add more refrigerant to the system
D.remove some of the refrigerant from the system
A.the relief valve should open before the high-pressure cutout
B.the relief valve should open and let excess refrigerant go to receiver
C.the high-pressure cutout switch should operate before the relief valve opens
D.close in on the suction valve
A.finished joints
B.welded joints
C.ground joints
D.soldered joints
A.a clogged scale trap
B.air in the system
C.automatic controls not functioning properly
D.insufficient cooling water to the condenser
A.separating chamber
B.system of baffles
C.purge valve
D.vacuum reducing valve
最新試題
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Cold weather starting of a diesel engine may be made easier by()
The condensers located in various stages of a flash evaporator are cooled by()
Which of the following items don’t belong to dock repair works?()
The treatment of the fuel oils involves storage, heating, filtering and()
() is not installed on the main switchboar.
To proceed to the assistance of a ship in distress is()
Diesel engine air start system check valves are opened by ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish