A.chief engineer
B.surveyor
C.the engineer
D.the technique personnel of the shipyard
您可能感興趣的試卷
你可能感興趣的試題
A.chief engineer
B.the engineer
C.captain
D.any member of the engine department
A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply
A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection
A.the repair standard of main docking repair item
B.the special tool for repair item
C.the skill of repairer
D.the status of docking repair equipment
最新試題
Diesel engine air start system check valves are opened by ()
If separating effect is not good, which measure should be taken ()
To proceed to the assistance of a ship in distress is()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The condensers located in various stages of a flash evaporator are cooled by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The shipboard oil pollution emergency plan will be invalid after ()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Cold weather starting of a diesel engine may be made easier by()