A.2
B.3
C.4
D.5
您可能感興趣的試卷
你可能感興趣的試題
A.open the indicator cocks
B.supply some LO to cylinder liner wall with lubricator
C.put the fuel handle in the "stop" position
D.pump up the air bottle
A.cooling water of the cooling system
B.fuel of the FO system
C.LO of the LO system
D.cooling water of the cooling system and LO of the LO system
A.to reduce heat stress
B.to reduce low temperature corrosion
C.to improve firing and starting performance
D.fuel saving
A.to inspect if the cylinder has the water leakage
B.to expel out the residual water/gas/oil from the cylinder
C.to check if fuel supply is normal
D.A and B
A.the main engine in the stand-by condition
B.auxiliary machinery in the stand-by condition
C.dynamical equipments in the stand-by condition and could be used immediately
D.A and B
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Using a file without a handle may result in ()
Which of the following items don’t belong to dock repair works?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()