單項(xiàng)選擇題The construction portfolio may be included as part of the ship().

A.general plans
B.operating manual
C.builders documentation
D.CCS file


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The circular steel structure installed around the propeller of a towboat is the().

A.nozzle
B.shroud
C.strut
D.hood

2.單項(xiàng)選擇題The bow thruster generally is ineffective at().

A.over 3 knots headway
B.at any speed astern
C.at any speed ahead
D.over 1 knot sternway

3.單項(xiàng)選擇題Structural bulkheads on a ship are usually().

A.continuous
B.watertight
C.transverse
D.non-watertight

4.單項(xiàng)選擇題Signs of racking stresses generally appear at the().

A.bow and stern shell frames and plating
B.junction of the frames with the beams and floors
C.garboard strake,at each side of the keel
D.thrust bearing of the main shaft

5.單項(xiàng)選擇題Sidewise force of the propeller tends to throw a vessel’s stern to the right or left,depending on rotation. This force is caused by().

A.back current from the rudder
B.greater pressure on the right or left side of the propeller,depending on rotation
C.lower pressure on the right or left side of the propeller,depending on rotation
D.torque from the velocity and angle at which the surrounding water impinges upon the propeller blades