A.discharging ashore into the sewer system
B.sealing in disposable plastic barrels aboard ship
C.discharging into a shore tank or stop barge
D.dumping into the ship’s bunker tanks
您可能感興趣的試卷
你可能感興趣的試題
A.water
B.dry chemical
C.foam
D.CO2
A.foam and water
B.CO2 and dry chemical
C.dry chemical and water
D.foam and CO2

最新試題
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Which of the following items don’t belong to dock repair works?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The shipboard oil pollution emergency plan will be invalid after ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish