A.cargo hatch
B.forecastle
C.steering engine
D.stern
您可能感興趣的試卷
你可能感興趣的試題
A.one short ton
B.one short metric ton
C.one long ton
D.one long metric ton
A.at
B.in
C.on
D.over
A.will put
B.would put
C.put
D.shall put
A.at
B.to
C.by
D.with
A.at
B.to
C.for
D.with
最新試題
There is another thing I want to let you know.The lighting in the hold is very poor,even ()dark to work the cargo.
Roll-on/roll-off ships are equipped with().
The patches where rust have been removed should be wiped clean before paint is().
The National Cargo Bureau represents the().
The through cargo in No.4 hatch square stands()the way.
The worn-out bags are all second-hand ones()stated in the Shipping Order.
The actual amount of cargo loaded depends upon().
The best way to determine if a load is within maximum lift limits is to use().
We usually choose cargo-handling equipment according to().
Strong smelling cargo should be stowed()the cargo absorbing foreign smell.