A.open loop control
B.feedback
C.combining control
D.integral process
您可能感興趣的試卷
你可能感興趣的試題
A.0~05Mpa
B.0~95Mpa
C.1~05Mpa
D.0~5Mpa
A.a mooring winch
B.a hoisting winch
C.a slewing winch
D.a luffing winch

最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Under MARPOL Code the ship to which it applies has to carry ()
Which of the following items don’t belong to dock repair works?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish