A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
您可能感興趣的試卷
你可能感興趣的試題
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in

最新試題
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
How should you signal the crane operator to lower the boom and raise the load().
When discharging an oil cargo,the first consideration is to().
Which method should be used to warm up the pump turbines prior to discharge().
What does “evel-luffing” accomplish during crane operations().