A.loading
B.leaving
C.arriving
D.sailing
您可能感興趣的試卷
你可能感興趣的試題
A.booster pump coming on the line and discharging properly
B.booster pump failing to start
C.booster pump being lined up in the wrong direction
D.ship's pump speeding up
A.arranging cargo
B.shipping cargo
C.cargo handling
D.weighing cargo

最新試題
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
The net productivity per gang-hour can be improved through a decrease of().
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
Which method should be used to warm up the pump turbines prior to discharge().