單項選擇題All the damage and shortage,()those incurred after discharge and before delivery to receivers,should be noted in the discharging report.
A.including
B.besides
C.except
D.in addition to
您可能感興趣的試卷
你可能感興趣的試題
1.單項選擇題A sling is a device used in().
A.hoisting cargo aboard a vessel
B.hoisting personnel aboard a vessel
C.securing a small boat to a large vessel
D.hoisting the anchor
2.單項選擇題A large basin cut into the shore,closed off by a caisson,and used for drydocking of ships is known as a().
A.slipway
B.graving dock
C.ground warp
D.caisson dock

最新試題
What is/are the advantage(s)of cranes over conventional cargo booms().
題型:單項選擇題
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
題型:單項選擇題
What does “evel-luffing” accomplish during crane operations().
題型:單項選擇題
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
題型:單項選擇題
The Master or person in charge of a ship shall ensure the crane record book shows the().
題型:單項選擇題