A.should be supported at 24 inch intervals with plastic tie wraps B.should never be located in a tank C.must be installed in conduit D.All of the above
A.uncorrected KG B.maximum allowed KG C.virtual height of the center of gravity D.metacentric height
A.The required oily-water separator malfunctions B.The ship is transferred to Liberian registry C.An annual survey is conducted fifteen months after the date of certificate issuance D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator