單項選擇題When starting a centrifugal pump, the discharge valve should be ().
A.closed
B.opened fully
C.cracked open
D.partly open
您可能感興趣的試卷
你可能感興趣的試題
1.單項選擇題When start a screw pump, the by pass valve should be ().
A.closed
B.opened fully
C.cracked open
D.partly open
2.單項選擇題A centrifugal pump can’t supply water after startingYou should check ().
A.priming water
B.power supply
C.packing gland
D.bearing lubrication

最新試題
The treatment of the fuel oils involves storage, heating, filtering and()
題型:單項選擇題
The shipboard oil pollution emergency plan will be invalid after ()
題型:單項選擇題
() is not installed on the main switchboar.
題型:單項選擇題
Using a file without a handle may result in ()
題型:單項選擇題
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
題型:單項選擇題