A.plugging all scuppers and drains
B.placing floating booms around the ship
C.regularly emptying all drip pans
D.thoroughly draining all bunkering hoses
您可能感興趣的試卷
你可能感興趣的試題
A.wash down the area immediately with a fire hose
B.wash down the area with kerosene
C.cover the area with absorbent material
D.cover the area with foam
A.transmitting the heat of a fire through the ship s metal
B.burning liquids flowing into another space
C.heated gases flowing through ventilation systems
D.the transfer of heat across an unobstructed space
A.Acetylene
B.Lube oil
C.Grease
D.All of the above
A.cover the area with foam
B.cover the area with absorbent material
C.wash down immediately with a fire hose
D.wash down immediately with an oil dispersing solvent
A.smoke
B.rate of temperature rise
C.ionized particles
D.all of the above
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
The condensers located in various stages of a flash evaporator are cooled by()
Under MARPOL Code the ship to which it applies has to carry ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
() is not installed on the main switchboar.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
To proceed to the assistance of a ship in distress is()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.