A.12 months
B.24 months
C.48 months
D.60 months
您可能感興趣的試卷
你可能感興趣的試題
A.American Bureau of Shipping classification rules
B.International Regulations for Preventing Collisions at Sea
C.Safety of Life at Sea Convention
D.Minerals Management Service rules
A.hot work permit
B.Certificate of Inspection
C.Safety of Life at Sea Certificate
D.station bill
A.hot work permit
B.Certificate of Inspection
C.Safety of Life at Sea Certificate
D.Muster List
A.Load Line Certificate
B.SOLAS Certificate
C.Stability Letter
D.Certificate of Inspection
A. Load Line Certificate
B. Certificate of Inspection
C. Safety of Life at Sea Certificate
D. operations manual
最新試題
As you hold a piece of manila line vertically in front of you,the strands run from the lower left to the upper right.Which type of line is this().
When paying out nylon line from around the bitts().
When a davit-launched raft is lowered from a ship,upon becoming waterborne,the raft is released by().
When two lines are spliced together,().
The size of wire rope is determined by the().
The Charterers shall have the privilege to ship dangerous cargo in accordance with()Code or any competent authorities’ regulations,as applicable.
What equipment is customarily used when seamen are working on a stage rigged over the side of a vessel().
An intermediate spring is().
Flanking rudders effect a vessel’s heading because of the().
In the manufacture of wire rope,if the wires are shaped to conform to the curvature of the finished rope before they are laid up,the rope is called().