單項(xiàng)選擇題If the length of a wire is halved and the cross-sectional area is doubled, the resistance will be ()

A.quartered
B.unchanged
C.doubled
D.quadrupled


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題AC and DC generators are similar in that they ()

A.both generate alternating voltages
B.both rectify the voltage before delivery
C.are constructed at the same physical size for the same kilowatt rating
D.both supply three-phase power

2.單項(xiàng)選擇題To increase the frequency of an operating AC generator, you should ()

A.increase the field excitation
B.decrease the field excitation
C.increase the number of magnetic poles
D.increase the speed of the prime mover

3.單項(xiàng)選擇題When measuring AC current flow, you must always connect the meter ()

A.in series with the power source and load
B.in parallel with the power source and load
C.insuring correct polarity
D.using the lowest range possible to prevent instrument damage

4.單項(xiàng)選擇題The frequency of an AC generator is adjusted by means of the ()

A.main alternator field rheostat
B.exciter field rheostat
C.prime mover governor control
D.equalizing reactor

5.單項(xiàng)選擇題When the current flow through a copper wire increases, its ()

A.resistance will decrease
B.insulation will bum
C.temperature will increase
D.conductivity will increase

最新試題

The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.

題型:?jiǎn)雾?xiàng)選擇題

One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()

題型:?jiǎn)雾?xiàng)選擇題

The ISPS Code consists of a mandatory section-Part A, which shows()

題型:?jiǎn)雾?xiàng)選擇題

The condensers located in various stages of a flash evaporator are cooled by()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

Which of the following items don’t belong to dock repair works?()

題型:?jiǎn)雾?xiàng)選擇題

Cold weather starting of a diesel engine may be made easier by()

題型:?jiǎn)雾?xiàng)選擇題

Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()

題型:?jiǎn)雾?xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:?jiǎn)雾?xiàng)選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:?jiǎn)雾?xiàng)選擇題