A.bridge control panel
B.disconnect links
C.governor relay box
D.main switchboard
您可能感興趣的試卷
你可能感興趣的試題
A.conductivity higher than a normal conductor
B.conductivity higher than a normal insulator
C.high conductivity at low temperatures
D.low conductivity at high temperatures
A.thousandth (10 to the-3rd power)
B.millionth (10 to the-6th power)
C.billionth (10 to the-9th power)
D.trillionth (10 to the-12th power)
A.monitoring signal
B.inverse signal
C.reverse signal
D.feedback signal
A.prevent main circuit overload
B.protect the circuit breaker blowout coil
C.prevent alternator motorization
D.prevent low voltage tripout
A.good insulation
B.bad insulation
C.high insulation power factor
D.a high slot discharge factor
最新試題
Which of the following items don’t belong to dock repair works?()
The cetane rating of diesel fuel is an indication of the ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The treatment of the fuel oils involves storage, heating, filtering and()
To proceed to the assistance of a ship in distress is()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The ISPS Code consists of a mandatory section-Part A, which shows()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()