A.Dram
B.Salient pole
C.Squirrel-cage
D.Wound-rotor
您可能感興趣的試卷
你可能感興趣的試題
A.load limit settings
B.idle speed settings
C.speed limit settings
D.speed droop settings
A.collect all available data on a casualty
B.recognize normal operation
C.identify the probable cause of a symptom
D.isolate the faulty component

最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Under MARPOL Code the ship to which it applies has to carry ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()