A.18 months
B.2 years
C.3 years
D.5 years
您可能感興趣的試卷
你可能感興趣的試題
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
最新試題
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
The bottom of the mast rests on a part of the keel called the mast().
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()
Tensile stress is a result of two forces acting in().
The conclusion is()the said ship is fit to continue to sail.
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
Please arrange()a surveyor to inspect the damaged bulkhead.
Connecting elements of a mooring system should be fabricated from().
Cracks may be prevented from developing at the corners of welded plating inserts by().
At()an occasional survey has been carried out.