A.項(xiàng)目進(jìn)度超前于計(jì)劃,項(xiàng)目成本控制在預(yù)算范圍內(nèi) B.項(xiàng)目進(jìn)度超前與計(jì)劃,項(xiàng)目成本超出預(yù)算 C.項(xiàng)目進(jìn)度落后與計(jì)劃,項(xiàng)目成本控制在預(yù)算范圍內(nèi) D.項(xiàng)目進(jìn)度落后于計(jì)劃,項(xiàng)目成本超出預(yù)算
A.11 B.16 C.20 D.28.5
A.工作分解結(jié)構(gòu)(WBS) B.因果關(guān)系圖 C.甘特圖 D.戴明環(huán)